Rehabilitation of the Barada River Stream

PROJECT DESCRIPTION

Trabulse Company restored the stream of the Barda River while carrying out the works of the infrastructure and the Excess from the Umayyad Square in Damascus until the river reaches the area of Bab Touma in Damascus. The distance was 8 km long and 8 meters wide.