The reconstruction of Umayyad Mosque courtyard

PROJECT DESCRIPTION

Traboulse Company re-prepared the courtyard of the Umayyad Mosque in Damascus from the work of paving the brick and the work of the infrastructure surrounding the mosque and doing the work of mud and calcite has been selected the workers on this project with great care for its historical importance and the fact that the site is one of the most important features of Damascus, Our efforts to get the most important and skilled craftsmen and experts in this area with thanks to the Ministry of Tourism and the Directorate of Museums, which did not spare our staff with expertise in this area.

Read more

Construction of Al-Hama bridge

PROJECT DESCRIPTION

Traboulse founder Eng. Ali Traboulse has established Al-Hama Bridge project on the banks of the river and the valley, which is located at the bottom of the bridge while working at Qassioun Company as its general manager.

The bridge is characterized by standard specifications with a height of 70 meters and width of 30 meters and a length of 400 meters. Construction was completed in 1975, the first of its kind in Syria and the Middle East in that year. Engineer Ali Traboulse was the study and the implementation person of this project.

Read more

Construction of the building of the Qasayoun Residential Society

PROJECT DESCRIPTION

Trabulse Company, after contracting with the Qaesion Residential Association, to carry out the construction works of its buildings in the project area of Damar Aljazeera 10C in Damascus city.

The project consists of six towers each tower consists of eight floors of housing with a floor area of 700 square meters
80% of  interior and exterior works were carried out within the contract terms and period and with the best specifications.

Read more

Project of the pedestrian tunnel market Hamidiya with the rehabilitation of the market Hamidiya

PROJECT DESCRIPTION

Trabulse contracted with the Governorate of Damascus to carry out a pedestrian tunnel project linking the Palace of Justice in Damascus and the market of Hamidiya. The tunnel was 9 meters deep from the road level and 60 meters wide. It contains shops and an electric staircase to get up and get out of the tunnel.

The project of maintenance of the Hamidiya market was the restoration of the pillars that have existed since the establishment of the market and the re-paving of the market road with the stone from the first market and even the courtyard of the Umayyad Mosque with work on the infrastructure in the project as a whole. The project was carried out at a record speed that reflects our experience in construction and construction. The completion period was 60 days from the beginning of the project until its completion.

Read more

Al-Siraan Restaurant Construction Project

PROJECT DESCRIPTION

Trabulse Company has built Al-Siraan Restaurant located on the Damascus International Airport Road.

  • Restaurant capacity: 2,500 people
  • Water bodies 3000 m² with a depth of 1 meter
  • 3 islands within the water bodies
Read more

Southern Expressway Project

PROJECT DESCRIPTION

Traboulse founder Eng. Ali Traboulse established the Southern highway Project, which is part of the Ring Road project that surrounds Damascus and is the study and executing person for this project.

The project consists of a 30 km long highway, 36 meters wide and four bridges.

The project was completed by Qassioun Company, which was its general manager at that time, and completed the project in a period and cost could not be any of the companies to get this project from their rival.

This project is considered one of the most vital roads in the city of Damascus at present.

Read more

Construction of Saad bin Ubada Complex

PROJECT DESCRIPTION

After signing a contract for the implementation of a religious complex project and a charitable hospital with the Ministry of Awqaf in Damascus, Trabulse implemented this complex with the cladding in Al-Mleiha area in the countryside of Damascus.

The compound consists of a 1200-square-meter hospital with a height of two floors above the ground and two legitimate schools to teach Islamic law with a floor area of 800 square meters, 6 floors above the ground and 500 square meters of mosque and prayer area.

Inside the mosque is the residence of the great companion Saad bin Ubada.

Read more

Project of tunnel and bridge 17 April

PROJECT DESCRIPTION

Trabulse Company studied and implemented the 17 April project to connect the Al Mezzah Estates to the Umayyad Square in Damascus through a bridge and linking the 17th of April Street and the Kafr Soussa area in Damascus by tunnel. This project is considered qualitative in terms of construction study and execution method.

The project has an integrated nodes to connect Al-Mezzah and Al-Azhar Street.

Read more

Project Council of Ministers Association buildings

PROJECT DESCRIPTION

Traboulse Company has studied and implemented a project of residential buildings for the Council of Ministers in the Eastern Al Mazzah Province of Damascus, Syria.

The project consists of four residential buildings consisting of each building from basement under entry level to serve the building and two floors above the ground with a floor area of 800 square meters and gardens surrounding the building to give the natural beauty of this project to be a residential complex with excellence.

Read more

Rehabilitation of the Barada River Stream

PROJECT DESCRIPTION

Trabulse Company restored the stream of the Barda River while carrying out the works of the infrastructure and the Excess from the Umayyad Square in Damascus until the river reaches the area of Bab Touma in Damascus. The distance was 8 km long and 8 meters wide.

Read more